Walz Human Performance Complex
Concordia University, Seward, Nebraska
Alvine
H&S Plumbing and Heating collaborated with Alive Engineering on the mechanical design of the building as well as providing all the mechanical construction. This two story structure contains an Arena with seating capacity of 3,500, locker rooms, offices, classrooms, laundry facilities, weight rooms and sports medicine areas. The facility also contains a single story field house for indoor track and field events.
PROJECT SUMMARY
Mechanical Project Cost
$2.8 M
General Contractor
Kiewit Building Group
Architect
Sinclair Hille
SYSTEMS INSTALLED
All Mechanical Site Utilities
Gas/Electric Roof Units
Variable Volume Terminal Units with Electric Reheat
Supply and Return Duct Systems
Central Exhaust Systems for locker rooms and restrooms
Domestic Water Piping
Waste and Vent Piping
Plumbing Fixtures and Equipment
Domestic Hot Water Systems and Water Softeners
Natural Gas Piping
Temperature Control System