top of page

Walz Human Performance Complex

Concordia University, Seward, Nebraska
Alvine

H&S Plumbing and Heating collaborated with Alive Engineering on the mechanical design of the building as well as providing all the mechanical construction. This two story structure contains an Arena with seating capacity of 3,500, locker rooms, offices, classrooms, laundry facilities, weight rooms and sports medicine areas. The facility also contains a single story field house for indoor track and field events.

PROJECT SUMMARY
Mechanical Project Cost

$2.8 M

General Contractor

Kiewit Building Group

Architect

Sinclair Hille

SYSTEMS INSTALLED
  • All Mechanical Site Utilities

  • Gas/Electric Roof Units

  • Variable Volume Terminal Units with Electric Reheat

  • Supply and Return Duct Systems

  • Central Exhaust Systems for locker rooms and restrooms

  • Domestic Water Piping

  • Waste and Vent Piping

  • Plumbing Fixtures and Equipment

  • Domestic Hot Water Systems and Water Softeners

  • Natural Gas Piping

  • Temperature Control System

PROJECT GALLERY
bottom of page