CHI Nebraska Heart Institute MOB
Lincoln, Nebraska
H&S Plumbing & Heating provided all mechanical construction for this new 60,000 square foot medical office building that was connected to the existing Heart Hospital. This facility houses offices to support the hospital and also has exam rooms, radiology and other medical support spaces. This project was a traditional bid project.
PROJECT SUMMARY
Mechanical Project Cost
$2.1 M
General Contractor
Weitz Construction
Architect
UNKNOWN
SYSTEMS INSTALLED
All Mechanical Site Utilities
Central AIr Handling Units
Central Exhaust Systems
Supply and Return Ductwork
Energy Recovery Ventilators
Hot Water Boiler for supplemental heating capability
Variable Volume Terminal Units with Hot Water Reheat
Specialized system including: medical air vacuum and gasses
Domestic Water Piping
Waste and Vent Piping
Plumbing Fixtures and Equipment
Roof and Storm Drain Piping
Natural Gas Piping
Temperature Control System
PROJECT GALLERY
